After analyzing the property’s utility usage and billing structure, we determined that EV chargers alone would not provide a viable solution due to the utility’s demand rates. A combination of solar, battery storage, and EV charging offered a stronger path forward, while a FreeWire charger with integrated battery storage allowed us to connect to the existing 240-volt transformer and significantly reduce installation costs.
The completed project includes one FreeWire charger and four 19.2 kW Blink Level 2 chargers, all connected through the EV Connect network. The result is a flexible EV charging solution designed around the site’s existing infrastructure and operational needs.