The client’s oligonucleotide lab was experiencing temperature and humidity spikes and unacceptable humidity levels, causing project loss and potential revenue losses in the millions of dollars. The client’s original design-build HVAC contractor proposed a solution that was more than double the client’s budget. Working in collaboration with the client’s preferred mechanical engineering team, IES developed a scope of work and budget that met the client’s fixed budget and timeline. The project was completed within the desired timeframe and within budget with no extras or added costs. The solution was fully implemented and the client saw immediate results that met or exceeded expectations.